P4C
The P4 Compiler
Loading...
Searching...
No Matches
CalcCriticalPathClusters Class Reference

#include <critical_path_clusters.h>

Inheritance diagram for CalcCriticalPathClusters:
[legend]

Public Member Functions

 CalcCriticalPathClusters (const CalcParserCriticalPath &parser_critical_path)
 
ordered_set< PHV::SuperCluster * > calc_critical_clusters (const std::list< PHV::SuperCluster * > &clusters) const
 
profile_t init_apply (const IR::Node *root) override
 
void print (std::ostream &out, const ordered_set< PHV::SuperCluster * > &clusters) const
 
- Public Member Functions inherited from P4::Inspector
const IR::Node * apply_visitor (const IR::Node *, const char *name=0) override
 
profile_t init_apply (const IR::Node *root) override
 
virtual void loop_revisit (const IR::Node *)
 
virtual void postorder (const IR::Node *)
 
virtual bool preorder (const IR::Node *)
 
virtual void revisit (const IR::Node *)
 
void revisit_visited ()
 
bool visit_in_progress (const IR::Node *n) const
 
void visitAgain () const override
 
void visitOnce () const override
 
- Public Member Functions inherited from P4::Visitor
virtual bool check_global (cstring)
 
virtual void clear_globals ()
 
virtual Visitor * clone () const
 
virtual ControlFlowVisitor * controlFlowVisitor ()
 
virtual void end_apply ()
 
virtual void end_apply (const IR::Node *root)
 
virtual void erase_global (cstring)
 
template<class T>
const T * findContext () const
 
template<class T>
const T * findContext (const Context *&c) const
 
template<class T>
const T * findOrigCtxt () const
 
template<class T>
const T * findOrigCtxt (const Context *&c) const
 
virtual Visitor & flow_clone ()
 
virtual void flow_merge (Visitor &)
 
virtual bool flow_merge_closure (Visitor &)
 
virtual void flow_merge_global_from (cstring)
 
virtual void flow_merge_global_to (cstring)
 
const Context * getChildContext () const
 
int getChildrenVisited () const
 
const Context * getContext () const
 
int getContextDepth () const
 
const IR::Node * getCurrentNode () const
 
template<class T>
const T * getCurrentNode () const
 
const IR::Node * getOriginal () const
 
template<class T>
const T * getOriginal () const
 
template<class T>
const T * getParent () const
 
virtual bool has_flow_joins () const
 
profile_t init_apply (const IR::Node *root, const Context *parent_context)
 
template<class T>
bool isInContext () const
 
template<class T>
bool isInContext (const Context *&c) const
 
bool isInContext (const IR::Node *n) const
 
virtual const char * name () const
 
template<class T>
void parallel_visit (const IR::Vector< T > &v, const char *name, int cidx)
 
template<class T>
void parallel_visit (const IR::Vector< T > &v, const char *name=0)
 
template<class T>
void parallel_visit (IR::Vector< T > &v, const char *name, int cidx)
 
template<class T>
void parallel_visit (IR::Vector< T > &v, const char *name=0)
 
void print_context () const
 
const Visitor & setCalledBy (const Visitor *visitor)
 
void setName (const char *name)
 
void visit (const IR::Node &n, const char *name, int cidx)
 
void visit (const IR::Node &n, const char *name=0)
 
void visit (const IR::Node *&n, const char *name, int cidx)
 
void visit (const IR::Node *&n, const char *name=0)
 
void visit (const IR::Node *const &n, const char *name, int cidx)
 
void visit (const IR::Node *const &n, const char *name=0)
 
void visit (IR::Node &n, const char *name, int cidx)
 
void visit (IR::Node &n, const char *name=0)
 
void visit (IR::Node *&, const char *=0, int=0)
 
template<class T, typename = std::enable_if_t<Util::has_SourceInfo_v<T> && !std::is_pointer_v<T>>, class... Args>
void warn (const int kind, const char *format, const T &node, Args &&...args)
 The const ref variant of the above.
 
template<class T, typename = std::enable_if_t<Util::has_SourceInfo_v<T>>, class... Args>
void warn (const int kind, const char *format, const T *node, Args &&...args)
 
bool warning_enabled (int warning_kind) const
 

Additional Inherited Members

- Public Types inherited from P4::Visitor
typedef Visitor_Context Context
 
- Static Public Member Functions inherited from P4::Visitor
static cstring demangle (const char *)
 
static bool warning_enabled (const Visitor *visitor, int warning_kind)
 
- Public Attributes inherited from P4::Visitor
const Visitor * called_by = nullptr
 
cstring internalName
 
SplitFlowVisit_base *& split_link
 
SplitFlowVisit_base * split_link_mem = nullptr
 
- Protected Member Functions inherited from P4::Visitor
virtual void init_join_flows (const IR::Node *)
 
virtual bool join_flows (const IR::Node *)
 
virtual void post_join_flows (const IR::Node *, const IR::Node *)
 
void visit_children (const IR::Node *, std::function< void()> fn)
 
- Protected Attributes inherited from P4::Visitor
bool dontForwardChildrenBeforePreorder = false
 
bool joinFlows = false
 
bool visitDagOnce = true
 

Detailed Description

Copyright (C) 2024 Intel Corporation

Licensed under the Apache License, Version 2.0 (the "License"); you may not use this file except in compliance with the License. You may obtain a copy of the License at

http://www.apache.org/licenses/LICENSE-2.0

Unless required by applicable law or agreed to in writing, software distributed under the License is distributed on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. See the License for the specific language governing permissions and limitations under the License.

SPDX-License-Identifier: Apache-2.0 Provide a function to produces an ordered_set<const SuperCluster*> that those SuperClusters have at least one cluster that has field(s) extracted on the parser critical path, either ingress or egress. The result can be fetched by getCriticalPathClusters().

This pass does not traverse the IR tree, nor does it change states. After spliting clusters, call calc_critical_clusters.

Precondition
Must run after CalcParserCriticalPath

Member Function Documentation

◆ init_apply()

Visitor::profile_t CalcCriticalPathClusters::init_apply ( const IR::Node * root)
override

Copyright (C) 2024 Intel Corporation

Licensed under the Apache License, Version 2.0 (the "License"); you may not use this file except in compliance with the License. You may obtain a copy of the License at

http://www.apache.org/licenses/LICENSE-2.0

Unless required by applicable law or agreed to in writing, software distributed under the License is distributed on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. See the License for the specific language governing permissions and limitations under the License.

SPDX-License-Identifier: Apache-2.0