![]() |
P4C
The P4 Compiler
|
This is the complete list of members for CalcCriticalPathClusters, including all inherited members.
apply_visitor(const IR::Node *, const char *name=0) override (defined in P4::Inspector) | P4::Inspector | virtual |
calc_critical_clusters(const std::list< PHV::SuperCluster * > &clusters) const (defined in CalcCriticalPathClusters) | CalcCriticalPathClusters | |
CalcCriticalPathClusters(const CalcParserCriticalPath &parser_critical_path) (defined in CalcCriticalPathClusters) | CalcCriticalPathClusters | inlineexplicit |
called_by (defined in P4::Visitor) | P4::Visitor | |
check_global(cstring) (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
clear_globals() (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
clone() const (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
Context typedef (defined in P4::Visitor) | P4::Visitor | |
controlFlowVisitor() (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
demangle(const char *) (defined in P4::Visitor) | P4::Visitor | static |
dontForwardChildrenBeforePreorder (defined in P4::Visitor) | P4::Visitor | protected |
end_apply() (defined in P4::Visitor) | P4::Visitor | virtual |
end_apply(const IR::Node *root) (defined in P4::Visitor) | P4::Visitor | virtual |
erase_global(cstring) (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
findContext(const Context *&c) const (defined in P4::Visitor) | P4::Visitor | inline |
findContext() const (defined in P4::Visitor) | P4::Visitor | inline |
findOrigCtxt(const Context *&c) const (defined in P4::Visitor) | P4::Visitor | inline |
findOrigCtxt() const (defined in P4::Visitor) | P4::Visitor | inline |
flow_clone() (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
flow_merge(Visitor &) | P4::Visitor | inlinevirtual |
flow_merge_closure(Visitor &) (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
flow_merge_global_from(cstring) (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
flow_merge_global_to(cstring) | P4::Visitor | inlinevirtual |
getChildContext() const (defined in P4::Visitor) | P4::Visitor | inline |
getChildrenVisited() const (defined in P4::Visitor) | P4::Visitor | inline |
getContext() const (defined in P4::Visitor) | P4::Visitor | inline |
getContextDepth() const (defined in P4::Visitor) | P4::Visitor | inline |
getCurrentNode() const | P4::Visitor | inline |
getOriginal() const (defined in P4::Visitor) | P4::Visitor | inline |
getParent() const (defined in P4::Visitor) | P4::Visitor | inline |
has_flow_joins() const (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
init_apply(const IR::Node *root) override | CalcCriticalPathClusters | |
init_apply(const IR::Node *root) override (defined in P4::Inspector) | P4::Inspector | virtual |
init_apply(const IR::Node *root, const Context *parent_context) (defined in P4::Visitor) | P4::Visitor | |
init_join_flows(const IR::Node *) (defined in P4::Visitor) | P4::Visitor | inlineprotectedvirtual |
internalName (defined in P4::Visitor) | P4::Visitor | mutable |
isInContext(const IR::Node *n) const (defined in P4::Visitor) | P4::Visitor | inline |
join_flows(const IR::Node *) | P4::Visitor | inlineprotectedvirtual |
joinFlows (defined in P4::Visitor) | P4::Visitor | protected |
loop_revisit(const IR::Node *) (defined in P4::Inspector) | P4::Inspector | inlinevirtual |
name() const (defined in P4::Visitor) | P4::Visitor | inlinevirtual |
parallel_visit(IR::Vector< T > &v, const char *name=0) (defined in P4::Visitor) | P4::Visitor | inline |
parallel_visit(const IR::Vector< T > &v, const char *name=0) (defined in P4::Visitor) | P4::Visitor | inline |
parallel_visit(IR::Vector< T > &v, const char *name, int cidx) (defined in P4::Visitor) | P4::Visitor | inline |
parallel_visit(const IR::Vector< T > &v, const char *name, int cidx) (defined in P4::Visitor) | P4::Visitor | inline |
post_join_flows(const IR::Node *, const IR::Node *) | P4::Visitor | inlineprotectedvirtual |
postorder(const IR::Node *) (defined in P4::Inspector) | P4::Inspector | inlinevirtual |
preorder(const IR::Node *) (defined in P4::Inspector) | P4::Inspector | inlinevirtual |
print(std::ostream &out, const ordered_set< PHV::SuperCluster * > &clusters) const (defined in CalcCriticalPathClusters) | CalcCriticalPathClusters | |
print_context() const (defined in P4::Visitor) | P4::Visitor | |
revisit(const IR::Node *) (defined in P4::Inspector) | P4::Inspector | inlinevirtual |
revisit_visited() (defined in P4::Inspector) | P4::Inspector | |
setCalledBy(const Visitor *visitor) (defined in P4::Visitor) | P4::Visitor | inline |
setName(const char *name) (defined in P4::Visitor) | P4::Visitor | inline |
split_link (defined in P4::Visitor) | P4::Visitor | |
split_link_mem (defined in P4::Visitor) | P4::Visitor | |
visit(const IR::Node *&n, const char *name=0) (defined in P4::Visitor) | P4::Visitor | inline |
visit(const IR::Node *const &n, const char *name=0) (defined in P4::Visitor) | P4::Visitor | inline |
visit(const IR::Node *&n, const char *name, int cidx) (defined in P4::Visitor) | P4::Visitor | inline |
visit(const IR::Node *const &n, const char *name, int cidx) (defined in P4::Visitor) | P4::Visitor | inline |
visit(IR::Node *&, const char *=0, int=0) (defined in P4::Visitor) | P4::Visitor | inline |
visit(IR::Node &n, const char *name=0) (defined in P4::Visitor) | P4::Visitor | inline |
visit(const IR::Node &n, const char *name=0) (defined in P4::Visitor) | P4::Visitor | inline |
visit(IR::Node &n, const char *name, int cidx) (defined in P4::Visitor) | P4::Visitor | inline |
visit(const IR::Node &n, const char *name, int cidx) (defined in P4::Visitor) | P4::Visitor | inline |
visit_children(const IR::Node *, std::function< void()> fn) (defined in P4::Visitor) | P4::Visitor | inlineprotected |
visit_in_progress(const IR::Node *n) const (defined in P4::Inspector) | P4::Inspector | |
visitAgain() const override (defined in P4::Inspector) | P4::Inspector | virtual |
visitDagOnce (defined in P4::Visitor) | P4::Visitor | protected |
visitOnce() const override (defined in P4::Inspector) | P4::Inspector | virtual |
Visitor() (defined in P4::Visitor) | P4::Visitor | inline |
warn(const int kind, const char *format, const T *node, Args &&...args) (defined in P4::Visitor) | P4::Visitor | inline |
P4::Inspector::warn(const int kind, const char *format, const T &node, Args &&...args) | P4::Visitor | inline |
warning_enabled(int warning_kind) const | P4::Visitor | inline |
P4::Inspector::warning_enabled(const Visitor *visitor, int warning_kind) | P4::Visitor | static |
~Visitor()=default (defined in P4::Visitor) | P4::Visitor | virtual |