![]() |
P4C
The P4 Compiler
|
#include <critical_path_clusters.h>
Public Member Functions | |
CalcCriticalPathClusters (const CalcParserCriticalPath &parser_critical_path) | |
ordered_set< PHV::SuperCluster * > | calc_critical_clusters (const std::list< PHV::SuperCluster * > &clusters) const |
profile_t | init_apply (const IR::Node *root) override |
void | print (std::ostream &out, const ordered_set< PHV::SuperCluster * > &clusters) const |
![]() | |
const IR::Node * | apply_visitor (const IR::Node *, const char *name=0) override |
profile_t | init_apply (const IR::Node *root) override |
virtual void | loop_revisit (const IR::Node *) |
virtual void | postorder (const IR::Node *) |
virtual bool | preorder (const IR::Node *) |
virtual void | revisit (const IR::Node *) |
void | revisit_visited () |
bool | visit_in_progress (const IR::Node *n) const |
void | visitAgain () const override |
void | visitOnce () const override |
![]() | |
virtual bool | check_global (cstring) |
virtual void | clear_globals () |
virtual Visitor * | clone () const |
virtual ControlFlowVisitor * | controlFlowVisitor () |
virtual void | end_apply () |
virtual void | end_apply (const IR::Node *root) |
virtual void | erase_global (cstring) |
template<class T > | |
const T * | findContext () const |
template<class T > | |
const T * | findContext (const Context *&c) const |
template<class T > | |
const T * | findOrigCtxt () const |
template<class T > | |
const T * | findOrigCtxt (const Context *&c) const |
virtual Visitor & | flow_clone () |
virtual void | flow_merge (Visitor &) |
virtual bool | flow_merge_closure (Visitor &) |
virtual void | flow_merge_global_from (cstring) |
virtual void | flow_merge_global_to (cstring) |
const Context * | getChildContext () const |
int | getChildrenVisited () const |
const Context * | getContext () const |
int | getContextDepth () const |
const IR::Node * | getCurrentNode () const |
template<class T > | |
const T * | getCurrentNode () const |
const IR::Node * | getOriginal () const |
template<class T > | |
const T * | getOriginal () const |
template<class T > | |
const T * | getParent () const |
virtual bool | has_flow_joins () const |
profile_t | init_apply (const IR::Node *root, const Context *parent_context) |
bool | isInContext (const IR::Node *n) const |
virtual const char * | name () const |
template<class T > | |
void | parallel_visit (const IR::Vector< T > &v, const char *name, int cidx) |
template<class T > | |
void | parallel_visit (const IR::Vector< T > &v, const char *name=0) |
template<class T > | |
void | parallel_visit (IR::Vector< T > &v, const char *name, int cidx) |
template<class T > | |
void | parallel_visit (IR::Vector< T > &v, const char *name=0) |
void | print_context () const |
const Visitor & | setCalledBy (const Visitor *visitor) |
void | setName (const char *name) |
void | visit (const IR::Node &n, const char *name, int cidx) |
void | visit (const IR::Node &n, const char *name=0) |
void | visit (const IR::Node *&n, const char *name, int cidx) |
void | visit (const IR::Node *&n, const char *name=0) |
void | visit (const IR::Node *const &n, const char *name, int cidx) |
void | visit (const IR::Node *const &n, const char *name=0) |
void | visit (IR::Node &n, const char *name, int cidx) |
void | visit (IR::Node &n, const char *name=0) |
void | visit (IR::Node *&, const char *=0, int=0) |
template<class T , typename = std::enable_if_t<Util::has_SourceInfo_v<T> && !std::is_pointer_v<T>>, class... Args> | |
void | warn (const int kind, const char *format, const T &node, Args &&...args) |
The const ref variant of the above. | |
template<class T , typename = std::enable_if_t<Util::has_SourceInfo_v<T>>, class... Args> | |
void | warn (const int kind, const char *format, const T *node, Args &&...args) |
bool | warning_enabled (int warning_kind) const |
Additional Inherited Members | |
![]() | |
typedef Visitor_Context | Context |
![]() | |
static cstring | demangle (const char *) |
static bool | warning_enabled (const Visitor *visitor, int warning_kind) |
![]() | |
const Visitor * | called_by = nullptr |
cstring | internalName |
SplitFlowVisit_base *& | split_link |
SplitFlowVisit_base * | split_link_mem = nullptr |
![]() | |
virtual void | init_join_flows (const IR::Node *) |
virtual bool | join_flows (const IR::Node *) |
virtual void | post_join_flows (const IR::Node *, const IR::Node *) |
void | visit_children (const IR::Node *, std::function< void()> fn) |
![]() | |
bool | dontForwardChildrenBeforePreorder = false |
bool | joinFlows = false |
bool | visitDagOnce = true |
Copyright (C) 2024 Intel Corporation
Licensed under the Apache License, Version 2.0 (the "License"); you may not use this file except in compliance with the License. You may obtain a copy of the License at
http://www.apache.org/licenses/LICENSE-2.0
Unless required by applicable law or agreed to in writing, software distributed under the License is distributed on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. See the License for the specific language governing permissions and limitations under the License.
SPDX-License-Identifier: Apache-2.0 Provide a function to produces an ordered_set<const SuperCluster*> that those SuperClusters have at least one cluster that has field(s) extracted on the parser critical path, either ingress or egress. The result can be fetched by getCriticalPathClusters().
This pass does not traverse the IR tree, nor does it change states. After spliting clusters, call calc_critical_clusters.
|
override |
Copyright (C) 2024 Intel Corporation
Licensed under the Apache License, Version 2.0 (the "License"); you may not use this file except in compliance with the License. You may obtain a copy of the License at
http://www.apache.org/licenses/LICENSE-2.0
Unless required by applicable law or agreed to in writing, software distributed under the License is distributed on an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. See the License for the specific language governing permissions and limitations under the License.
SPDX-License-Identifier: Apache-2.0